The City of Dublin provides a high level of service to its residents and visitors through a variety of improvement projects, including road maintenance, intersection upgrades and multi-use path development. Follow progress with our interactive construction map, updated by engineers and other City employees as projects are underway.


Hyland-Croy Road / Cacchio Lane Connector Public Meeting

The City of Dublin is currently working on the design of the Hyland-Croy Road / Cacchio Lane Connector project. The design and plans are approximately 60% complete. This project, which is intended for construction in 2018, provides for the extension of Cacchio Lane to Hyland-Croy Road
Continue Reading →

John Shields Parkway/Dale Drive Intersection Changes

Changes are in place at the intersection of John Shields Parkway and Dale Drive. Earlier this year, the east leg of the intersection opened from Dale Drive to Village Parkway near the rear of the AMC Dublin Village 18 Theater, completing the connection from Riverside Drive to Village
Continue Reading →

Hyland-Croy Road Path Extension

A new recreation path connection was completed in 2017 between Jerome High School and Tuscany Drive. The 550-foot path connects two existing paths. This project was part of the nearly one mile of new paths the City is adding this year. The City of Dublin features about 110 miles of re
Continue Reading →

Upcoming Work Schedule at I-270/US 33

Upcoming Impacts to Traffic at 270/33 in Dublin Friday, October 13, 2017  7 PM: I-270 NB reduced to two lanes between Tuttle Crossing Blvd. and US 33. 9 PM: I-270 SB reduced to two lanes between US 33 and Tuttle Crossing Blvd. 5 AM: All lanes open.   Saturday, October 14, 2017  6
Continue Reading →

Avery/Brand Roundabout Now Open

The roundabout is now open at the intersection of Avery and Brand Roads. Despite the roundabout’s completion, there is still pavement work to be completed on Brand Road. There will be lane restrictions on Brand Road for the next couple of weeks until the paving is complete. Traf
Continue Reading →

Concord Road Recreation Path Construction Complete

Work is complete on a new section of recreation path on the east side of Concord Road between Glick Road and St. Boswell Court; providing a connection to approximately Dublin’s corporation limit. Concord Township continues to discuss path options for a connection to Eli Pinney Element
Continue Reading →

SR 161/Cosgray Road Intersection Improvements

Changes are in effect to improve the intersection of SR 161 and Cosgray Road. These changes are an interim solution expected to remain in effect until 2017. There is a new traffic configuration at the intersection of S.R. 161 and Cosgray Road. A traffic signal is now in place and oper
Continue Reading →

Changes Planned for S.R. 161/Riverside Drive Roundabout

The City of Dublin will be making some changes at the S.R. 161/Riverside Dr. roundabout to better accommodate driver behavior and traffic patterns. Specifically, lane assignment changes will be made on northbound Riverside Drive. The City and contractor are still working on a plan to
Continue Reading →

Sidewalk Shaving

A contractor will begin sidewalk shaving in various locations around Dublin in mid-October. Shaving will be performed at roughly 100 locations that have already been determined and approved. The full project will take a few weeks to complete, but each location is expected to take appr
Continue Reading →

Tunnel Painting

Beginning the week of October 2, 2017, crews will begin painting two tunnels- one under Avery-Muirfield Drive at Tullymore Drive and the other at Glick Road and Rothesay Drive. This work will require the closure of the tunnels and the paths going in and out of the tunnels for approxim
Continue Reading →

Riverside Drive Culvert Replacement

The City of Dublin has replaced the culvert on Riverside Drive just north of the Scioto Park entrance. The work is substantially complete and no further traffic impacts are anticipated at this time. The replacement was necessary due to the deteriorating condition of the existing culve
Continue Reading →

U.S. 33 Paving – September 22

US 33 between Avery-Muirfield Road & SR 161/Post Road 7 PM: US 33 will reduce to one lane in each direction 7 PM: Ramp from US 33 EB to SR 161/Post Road will close Detour: US 33 EB to Avery-Muirfield Drive to US 33 WB to SR 161/Post Road 8 PM: Ramp from SR 161/Post Road to US 33 W
Continue Reading →

Coffman Park Drive Parking Lots Now Open

All parking lots on Coffman Park Drive are now open! The lots near Coffman Park and the Coffman Park Amphitheater have been reconstructed, paved and striped. These lots were improved as part of the 2017 Shared-Use Path and Parking Lot Maintenance Program. Thank you for your patience.
Continue Reading →

Live Camera – Pedestrian/Bicycle Bridge Construction

Live Camera Iconic Pedestrian/Bicycle Bridge Spanning the Scioto A pedestrian and bicycle bridge will span the Scioto River in the heart of Dublin connecting the future Riverside Crossing Park on the east side of the river as well as nearby commercial, residential and retail to Downto
Continue Reading →

Public Meeting – Proposed Recreation Path Connection along Concord Road

Concord Township, in conjunction with the City of Dublin, invites you to a public input meeting on Tuesday, August 8, 2017 regarding a proposed recreation path connection along Concord Road. Township and City leaders have been discussing options for a path connection along Concord Roa
Continue Reading →

Utility Work in Muirfield Area

Lane restrictions are expected during off-peak travel hours along Muirfield Drive and Tullymore Drive for utility work.  Traffic will be maintained in all directions and a message board is being used to direct drivers. ### Media contact: Lindsay Weisenauer Senior Public Information Of
Continue Reading →

Smiley Park Recreation Path

Recreation path construction is expected from late July through October 2017 on a recreation path connecting Metro Place South and Smiley Park. The project involves 1,300 feet of new path along the west side of 535 Metro Place South connecting to Smiley Park. No traffic impacts are ex
Continue Reading →

Iconic Pedestrian/Bicycle Bridge Spanning the Scioto

A pedestrian and bicycle bridge will span the Scioto River in the heart of Dublin connecting the future Riverside Crossing Park on the east side of the river as well as nearby commercial, residential and retail to Downtown Dublin on the west side.
Continue Reading →

Westside Widening on Interstate 270 Begins – Speed Limits Will Vary

Drivers Take Notice: Speed Limits Will Vary Update: I-270 Widening Between Dublin and Hilliard Crews hope the rains in the forecast have moved out so the widening project on Interstate 270 on the west side between Dublin and Trabue Road is able to move into the next phase of construct
Continue Reading →

Utility Billing and Metering Systems Audit

The City of Columbus Department of Public Utilities has contracted with the firm Utility Revenue Management (URM) to perform an audit on its sewer and water customer billing and metering systems. The audit includes all customers that are billed by the City of Columbus and will include
Continue Reading →

‘Smart Corridor’ Construction Underway

FRANKLIN COUNTY – Construction started today here in Central Ohio that will bring the region one step closer to self-driving vehicles. 35 miles of high-capacity fiber optic cable will be installed underground alongside US 33 between Dublin and East Liberty in Logan, Union, and Frankli
Continue Reading →

Hyland-Croy Road/Riviera Connector Surveying

Beginning the week of June 12, an IBI Group survey crew will be collecting right-of-way, property corner and topographic information for the design of a new roadway connecting the Riviera Subdivision with Hyland-Croy Road north of Dublin Jerome High School. A letter has been sent to r
Continue Reading →

Utility Work on Riverside Drive

Beginning Tuesday May 16, 2017, lane restrictions are expected on northbound Riverside Drive between Emerald Parkway and Hard Road due to utility work. Columbus Fibernet will be removing fiber cable from the sanitary sewer system. The work will take place daily between 8 a.m. and 4 p.
Continue Reading →

Rings Road Recreation Path Work Underway

The City of Dublin is adding 2,000 feet of recreation path along Rings Road between Frantz and Dublin roads. The project includes 8-foot wide path, concrete curb and gutter, curb ramps, storm sewer improvements, fire hydrant relocation and turf restoration. During the path constructio
Continue Reading →