Darree Fields

The parking lot will be resurfaced starting the week of June 3 through June 21. Vehicles will not be able to enter the northeast areas of the park. The first intersection within the park that allows for turns into the ball field area will have temporary closures during the day but wil
Continue Reading →

Avery Road Muirfield Drive

Starting Monday, June 3 through July 21 (weather pending), paving and concrete work is scheduled on Avery Muirfield Drive from Shier Rings Road to Post Road. This is primarily a night paving project but concrete repairs, traffic control and striping will be done during the day. There
Continue Reading →

Shier Rings Road and Eiterman Road

Beginning Monday, June 3 through June 25, Shier Rings Road will be closed west of the City’s Fleet Maintenance Drive to Eiterman Road. And Eiterman Road will be closed from Shier Rings Road to the Nestle facility. Questions, contact Darren Lee, P.E., 614.410.4625, dlee@dublin.oh.us
Continue Reading →

Dublin Road South Bikepath

Construction will extend the City’s shared use path system on Dublin Road from Hertford Lane to Rings Road. The project involves the construction of approximately 1,230 feet of 8-foot wide asphalt bikepath, concrete ramps, stone walls, and a pre-fabricated pedestrian bridge. Dublin Ro
Continue Reading →

Sells Mill Drive

Starting on June 20 through July 26 paving and concrete work is scheduled for Sells Mill Drive, Schoolcraft Drive, Sachem Court and Muncie Court. Questions, contact Darren Lee, P.E., 614-410-4625, dlee@dublin.oh.us
Continue Reading →

Fallen Timbers

Starting in late May through early July concrete work and paving is scheduled for Arapahoe Court, Erie Street, Blackhawk Court and Ottawa Place. Questions, contact Darren Lee, P.E., 614-410-4625, dlee@dublin.oh.us
Continue Reading →

Emerald Parkway Improvements at Tuttle Crossing

What: The project widens Emerald Parkway between Tuttle Crossing Boulevard and Rings Road and adds two roundabouts, a bike path and other improvements. Motorists should expect traffic changes as the work on the Emerald Parkway widening project continues. On Saturday, May 11, traffic p
Continue Reading →

Dublin Road Water Tower

The Dublin Road Water Tower will be painted in May with completion anticipated in early June 2013.
Continue Reading →

Hyland Croy/Brand Road Roundabout

A multi-lane roundabout will be built at the intersection of Hyland Croy Road and Brand Road near Dublin Jerome High School. The south (Hyland Croy) and west (Mitchell DeWitt) legs of the intersection will be closed June 7, 2013 with an anticipated completion date of early September,
Continue Reading →

Coffman Road/Brand Road Roundabout

What: A single lane roundabout will be built in 2013 at the intersection of Coffman Road and Brand Road. The tentative construction start has not yet been determined More information and detours will be provided this spring.
Continue Reading →

Post Road Closure on Saturday, May 11

Post Road from Avery Muirfield to Perimeter Drive will be temporarily closed on Saturday, May 11 from 7 to 11 am. There will be detour routing and signs placed accordingly with provisions for local traffic to pass as needed. This work is needed to verify existing utility depths for a
Continue Reading →

Emerald Parkway Phase 8

What: Emerald Parkway, Phase 8 will be the completion of a long term goal of creating an alternative route to I-270 in the Dublin area. This final phase will extend the parkway from Riverside Drive to just north of Bright Road, at a new bridge over Billingsley Creek. When: The City an
Continue Reading →

New Bike Path along Glick Road

Construction of a new bike path along Glick Road will begin the week of September 4. The new 3,000-ft bike path will be located on the south side of Glick Road between Muirfield Drive and Carnoustie Drive. The first phase of construction will involve the removal of trees along the str