Shier Rings Road - Corridor Study - page 24

24
SHIER RINGS ROADWAY CORRIDOR CHARACTER STUDY
Recommendations | Implementation
STREETSCAPE
POTENTIAL INFILL SITES
PUBLIC IMPROVEMENTS
PRIVATE DEVELOPMENT
ROUNDABOUTS
Eiterman Road
Avery Road
SHIER RINGS ROAD REALIGNMENT
Wilcox Road
SUMMARY
The planning goals for this study included: analyzing existing conditions, identifying
complimentary planning efforts, providing strategies for balancing diverse mobility
needs, recommending right-of-way improvements which include pedestrian, bike and site
landscape elements.
It is important to note that none of the improvements are imminent; this study is in
anticipation of future roadway projects, consistent with Dublin’s tradition of planning for
future infrastructure improvements. The intent is to demonstrate to potential purchasers
or developers the City’s long range view of how particular properties should be developed.
As new sites are developed, each will be required to dedicate right-of-way and/or construct
new roadway segments as appropriate to accommodate the increased vehicles. Specific
design details and character elements will be implemented based on the site and traffic
analysis for that property.
The specific and final locations
and character of the public
improvements including
realignment will be determined
after additional study for
each site and coordination
between City Departments
and complimentary planning
efforts.
1...,14,15,16,17,18,19,20,21,22,23 25
Powered by FlippingBook