Page 384 - parks-master-plan

This is a SEO version of parks-master-plan. Click here to view full version

« Previous Page Table of Contents Next Page »

- 1 6 7 -

Parks and Recreat ion Mas t er P lan

Above: Stormwater management wet-land and aesthetic treatment

Left: Entry sign and stormwater detention basin

Play area / tot lot for chil-dren aged 2-12 years

PRELIMINARY SITE RECOMMENDATIONS

Open Space Utilization

• Naturalize low-priority lawn areas • Increase/Establish more shade tree stands

Park Functionality

• Provide better shading of existing play areas with supplemental plantings on south/southwest edges

S tormwat er / Resource Managemen t

• Address on-site drainage/erosion condition

Page 384 - parks-master-plan

This is a SEO version of parks-master-plan. Click here to view full version

« Previous Page Table of Contents Next Page »