29
#
dublin
is
home
to
1,200AcresofParkland
Dublinhasmore than1,200acresof parklandand100milesof bikepaths. In2013,much
workwas accomplished incontinuing tobeatify thecommunitywhile laying thegroundwork
for additional parks aswell as improvements toexistingparkland.. InMay, afield labwasheldby
TheOhioStateUniversity; 40 studentsparticipated inanarcheological dig to studyandpreserve
theHolder-Wright Earthwork.
ParkDevelopment
Installed2,100 feet of irrigationpipes atDarreeFields and2,860 feet of irrigationpipeatAveryPark.
•
Addedapatio to theDublinCommunityRecreationCenter.
•
Completed theconstructionof IGS
Park includingabikepath, benches, picnicnodes, and stabilized the streambanks.
•
ReceivedOhio
Department ofTransportationandCityofDublinapprovals for theconstructionof EmeraldParkway
BridgeParkprovidingaccess to theSciotoRiver and stabilizing the riverbank.
•
CoffmanPark
Expansionproject construction started.
•
The$3.5Mproject includes landscaping, burying the
overheadutilities, realigning theoldPost Roadentrance for a smoother transition toCommerce
Parkway, installing threepedestrianbridges andgrading to removeany tracesof theoldPost Road
roadbed.
•
SciotoPark stairswere improvedand the restroom renovationproject began.
•
Improvements toCramersCrossingbeganandWellingtonPark improvementsweredesigned.
NatureEducation
Receivedour thirdconsecutive recertificationwith theNationalWildlife
Federation; Dublin remained theonlycommunity inOhiowith the
“CommunityHabitatCertification.
•
Taught natureeducationclasses to
4,500participants.
•
TheOhioCommunityWildlifeCooperativeheld its
third stateconferencewith100participants from61 local governments.
•
Constructionof theDublinCommunityGardens and installationof
garden irrigationwas completed. Coordinated twoNeighborhood
RecyclingEventswithnearly13,000poundsdiverted from the landfill.
•
Volunteers tended to150Bluebirdboxes anddedicated750hours
planting,mulchingand removing invasive species fromparks.
Forestry
InApril, EarthDaywas celebratedatDeer RunElementarySchool.
•
Nearly3,000hourswasdedicated
toplanting treesonDublin’s streets, green spaces andmedians; 773 treeswereplantedand the
average sizeof thecaliper of the treewas 2”.
•
EmeraldAshBorers continued to receiveattention
withbi-annual injections.
•
Nearly540hourswere spent inspecting trees affectedby the sidewalk
replacement program; one fulltimeemployee spent almost fourmonths inspectingandcalculating
tree root loss.
Horticulture
40flatsof pansieswereplanted inHistoricDublin.
•
Handled the installationof newor replacements
of 193 trees and340 shrubs.
•
Mulched25parks andHistoricDublin;more than1,500yardsofmulch
was applied.