The City of Dublin invests each year to keep our streets in great shape. Dozens of streets in neighborhoods around the City will be improved this year. These improvements include roadway resurfacing and reconstruction, roadway base stabilization, roadway spot repair, curb and gutter replacement, installation of ADA compliant curb ramps and other associated work.
The street maintenance program runs annually. Please see the interactive map below for the streets planned for the next five years (subject to change). Residents will receive a notification if their street is on the list. The City and contractor will keep residents informed through the stages of construction.
What happens during construction?
There are multiple stages in resurfacing or reconstructing a street. You will notice equipment such as backhoes, concrete saws, front-end loaders and dump trucks hauling construction materials in and out. There will be days when you observe a lot of activity and other days when you see very little activity. Once construction begins on your street, it will be completed in a timely manner.
Access to your street, and sometimes your driveway, may be obstructed during construction hours. Some streets may be closed to through traffic. We do not plan to disturb private property. However, if any damage does occur to your lawn, it will be repaired. The City appreciates the property owner’s cooperation in watering newly seeded areas. Please notify your lawn services of any seeded areas on your property.
Your mailbox may be temporarily removed during this process. Temporary mailboxes will be placed during the project to allow for uninterrupted mail delivery. Once the improvements are done, your mailbox will be permanently reset in its original location in the same or better condition than when the project began.
There will be no changes in your emergency services. The police and fire departments will be notified of all traffic restrictions. All lawn waste, garbage and recyclable collection should continue according to their normal pick-up schedules unless you are advised otherwise.
Construction will start at 7 a.m. You will normally have access to your driveway. If a new curb is installed in front of your driveway, you will not have access to your driveway for 7 days. You will receive advance notice of this work.
Please minimize on-street parking in the work zone when possible. On-street parking will be available outside of the work limits.
If you have a sprinkler system or electric dog fence immediately behind the curb, please notify Doug Fleck at 614.410.4668 or dfleck@dublin.oh.us as soon as possible. Please have the irrigation system or dog fence marked with marking paint or flags prior to construction activities (following notification signage posted in your area.) The contractor will be notified so that they can use caution during curb removal or other work in the vicinity. Should the contractor damage your sprinkler system or dog fence after the City is notified and the irrigation system or dog fence was marked as requested, the contractor will repair it to its original condition as soon as possible. Once construction begins in front of your house, please test your dog fence before you let your dog out.
The Street Maintenance Program consists of replacement of deteriorated concrete curb and gutter, street base stabilization, milling of deteriorated pavement surfaces and placement of new asphalt pavement. The factors used to prioritize and select streets for inclusion in the program include:
The following communication methods will be used to communicate construction information with the residents and motorists throughout the duration of this project.
If you have questions or would like more information, please contact Deputy Director of Communications & Marketing Aisling Babbitt at 614.907.0739 or ababbitt@dublin.oh.us.
In order to support faster response and better tracking of requests, the City of Dublin uses JustFOIA to collect, respond to and manage public information requests.
JustFOIA is a Freedom of Information Act (FOIA) online application that helps streamline the open records request process for the community and improve efficiencies in getting requested information quickly and accurately.
The application lets community members submit requests for all city records, including police reports. Commonly requested information includes accident reports, copies of resolutions and body-camera video.
We are and always have been a proud local democracy. In our service, we strive to provide the best quality of life and environment in which our residents and businesses can thrive. We seek to ally our proud traditions with the best innovations of the future.
Dublin, Ohio, is the most sustainable, connected and resilient global city of choice.
Integrity, Respect, Communication, Teamwork, Accountability, Positive Attitude & Dedication to Service.
The City of Dublin operates under a set of seven key core values: integrity, respect, communication, teamwork, accountability, positive attitude and dedication to service. Staff members use these seven values as the basis for daily decision-making, including the decisions that go into the budget process.
We are members of an organization that succeeds because of teamwork, dedication, diversity and the innovative spirit of all of our members. Together, we build a culture of trust, service, mutual respect, inclusion and open communication. We hold ourselves mutually accountable to promote and sustain continuous learning and to develop the learning potential that exists in every member of our team.
The complete Dublin City Code is available online at American Legal City Ordinance website. Information staff at the Dublin branch of the Columbus Metropolitan Library are available to help navigate this website.
This Revised Charter, as adopted on March 19, 1996, became effective on July 4, 1996.
The Zoning Code for Dublin is Chapter 153 of the Dublin Code of Ordinances. The Zoning Code sets land development requirements and establishes different uses within individual districts. Zoning regulations address the physical development of a site, such as building height, lot requirements, setbacks from lot lines, minimum numbers of parking spaces, sign types and sizes, and other related regulations.
Jenny Rauch, Director of Planning
Phone:
614.410.4600
Code Enforcement:
614.410.4647
Zoning Compliance:
614.410.4661
Fax:
614.410.4747
Hours:
Monday – Friday
8 am – 5 pm
Brad Fagrell, PE, Director of Building Standards, Chief Building Official
Phone:
Permit Window: 614.410.4670
Review Services: 614.410.4608
Fax:
614.410.4697
Permit Window Hours:
Monday – Friday
8 a.m. – 4 p.m.
Inspector Phone Availability:
7:30 a.m. – 3:30 a.m.
Report an Issue
Request a service or report an Issue.
Tell Dublin
Send us your public input.
5555 Perimeter Drive
Dublin, Ohio, 43017
Mon – Fri: 8 a.m. – 5 p.m.