Cosgray Road & Faust Ditch Drainage Improvements 

The project seeks to improve the roadside drainage along Cosgray Road, south of Rings Road, with a storm sewer system and improve existing Faust Ditch from the storm sewer to Hayden Run Road.

Work Status

  • Improving the storm sewer system along Cosgray Road between Rings Road to Faust Ditch

Traffic Impact

  • Cosgray Road between Rings Road and Faust Ditch re-opened to traffic Friday, Sept. 26.
  • Cosgray closed again Monday, Oct. 6 for railroad repairs between Rings Road and Churchman Road. It is set to re-open on Saturday, Oct. 11 at 10 a.m.
    • Detour route for northbound Cosgray Road will be east on Hayden Run Road, north on Avery Road, west on Rings Roads and back to Cosgray Road
    • Detour route for southbound Cosgray Road will be east on Rings Road, south on Avery Road, west on Hayden Run Road back to Cosgray Road

Completion Date

  • March 2026

Please use caution and follow posted detour signs in the area. Thank you for your cooperation as crews complete this critical infrastructure work.

Questions can be directed to the Franklin County Engineer’s Office at 614.525.3030.

Latest Video

Latest Photos