Strawser Construction will be performing crack sealing and mastic repairs on the following streets on Aug. 31-Sept. 4, weather dependent.
-
Black Abbey Ct
-
Brigids Close Dr
-
Chatham Ct
-
Donegal Cliffs Dr
-
Dublinshire Dr
-
Dunleary Dr
-
Enfield Trace
-
Gaelic Ct
-
Grafton End
-
Haddler Ct
-
Heather Glen Blvd
-
Heather Glen Ct
-
Hirth Rd
-
Kendall Ridge Loop
-
Lerwick Dr
-
Rothesay Ct
-
Round Tower Ln
-
Scotia Ct
-
Scotsman Ct
-
Tusswell Dr
-
Wyndburne Dr
-
Wynford Dr
-
Wynwright Dr
No traffic closures are expected. Flaggers and rolling operations will be used to manage traffic.











