Brand Road Bridge Replacement

As part of ongoing infrastructure improvements, the Franklin County Engineer’s Office will close Brand Road between Muirfield Drive and Coffman Road July 8-Aug. 1 for a bridge replacement and box culvert installation over Bear Run/Bishop Ditch. The road will be open to local traffic up to Bristol Parkway, from the west, and Brandonway Drive, from the east.

Work Status:

  • Brand Road is now open to full traffic.

Traffic Impact:

  • Brand Road will be one-lane, two-way traffic via flagger operation Aug. 12-16.

Completion Date:

  • Fall 2024

Other Work in the Area: 

Work is also planned for the Brandonway Drive Bridge, between Brand Road and Wellston Court/Aldridge Place.  This work will also start on July 8, 2024, and last until Oct. 31, 2024. Detour routes are posted for this road closure.

Latest Video

Latest Photos

Skip to content