Brandonway Drive Bridge Replacement

As part of ongoing infrastructure improvements, the Brandonway Drive bridge over North Fork Indian Run will be replaced. The new structure will be widened to allow for shared use paths on both sides of the bridge. To allow for the construction, Brandonway Drive will close between Brand Road and Wellston Court/Aldridge Place July 8 through Oct. 31.

Work Status:

  • Replace the existing box beam bridge, reconstruct Brandonway Drive at the bridge and install new sidewalk along the east side of the bridge.

Traffic Impact:

  • Brandonway Drive reopened to traffic on Nov. 8.
  • Sidewalk and shared use path repairs are still in process, but traffic will be maintained.

Completion Date:

  • Fall 2024

 

Latest Video

Latest Photos

Skip to content