This project is substantially complete and there is no anticipated impact to traffic.
These improvements will enhance safety for drivers, bicyclists and pedestrians. They will also enhance the appearance of the intersections while reducing the frequency of required maintenance.
The City strives to minimize inconveniences as improvements are made. Closing one intersection at a time is the safest option for construction crews and drivers. Additionally, closing the intersections allows the project to be completed in a shorter time, which will avoid winter work.
Detours will be posted directing drivers to use main roadways including Woerner Temple, Eiterman, Rings, Cosgray, Avery and Shier Rings roads. The shared use paths at the intersections will be closed to ensure safety.
Posted Detour
* Local traffic may use neighborhood streets as alternate routes.
If you have any questions, please contact Engineering Inspector Jeremy Cooper by calling 614.410.4634 or emailing jcooper@dublin.oh.us. We will be working diligently to restore the area as quickly as possible.